Hani Energy Company has been working with various products related to the subject of power plant, turbine control, excitation systems during these years.
Production Catalogs
HANI
Our standards
Hani company, after years of experience in the field of electronic engineering and manufacturing of turbine controllers and generator excitation with ISO 9001, iso14001, iso 18001, ims standards, is a leader in this field.
Upon receiving these valuable certifications, Hani Engineering Company is one of the leading activists and is expected to play its role more effectively and prominently in the development of related activities in this field.
- The ISO 9000 family of quality management systems is a set of standards that helps organizations ensure they meet customer and other stakeholder needs within statutory and regulatory requirements related to a product or service
- ISO 14000 is a family of standards related to environmental management that exists to help organizations minimize how their operations negatively affect the environment; comply with applicable laws, regulations, and other environmentally oriented requirements; and continually improve in the above
- OHSAS 18001 (ISO 45001), Occupational Health and Safety Assessment Series, was a British Standard for occupational health and safety management systems. Compliance with it enabled organizations to demonstrate that they had a system in place for occupational health and safety.
- IMS certification is certification for multiple management system standards is usually evaluated in a single, comprehensive audit. Organisations spend less time preparing for audits and responding to their findings, significantly reducing the overall investment of time and money.
HANI
Resume
HANI ENERGY Resume
Hani Energy Company operates in the field of turbine control, excitation systems and power plants. You can download the company’s resume below.
Turbine Control System
UPGRADE 32 MW Asec Unit control System
This system has been designed and implemented for 32 megawatts of Acec unit and replaced the old pneumatic control system.
Project: Design and installation of control and protection system for gas turbine
Unit name: Asec
Used Technology: DCS SIEMENS PCS7
Estimated time: 18 Month
Unit capacity: 32 Mega Watt
Delivery Date: 2015 November
UPGRADE 32 MW Asec 2nd Unit control System
Another sample of control system installation with its technical specification:
Project: Design and installation of control and protection system for gas turbine
Unit name: Asec
Used Technology: DCS SIEMENS PCS7
Estimated time: 7 Month
Unit capacity: 32 Mega Watt
Delivery Date: 2017December
UPGRADE 4 MW Typhoon Unit control System
Designing and replacing the control systems of 8 turbo-pumps of the pump stations of an oil’s pipelining company was deposited to our company.
Project: Design and installation of control and protection system for gas turbine
Unit name: Typhoon
Used Technology: DCS SIEMENS PCS7
Estimated time: 12 Month
Unit capacity: 4 Mega Watt
Delivery Date: 2017 May
UPGRADE 20 MW GE Unit control System
The project related to the change of a power plant control system. The whole design, implementation and installation phases of this project took four months. Working under time constraints become a routine at HANI ENERGY company due to the limited possibility of power plants in outphasing of their units.
Project: Design and installation of control and protection system for gas turbine
Unit name: GE
Used Technology: DCS SIEMENS PCS7
Estimated time: 4 Month
Unit capacity: 20 Mega Watt
Delivery Date: 2018
UPGRADE 25 MW Alstom Unit control System
In this project, only the turbine and generator in the mechanical sector has purchased by the power plant owner and all other equipment supplied and installed by Hani Energy Company. The parts that were designed and manufactured by the company include turbine control and protection system, AVR system and generator protection, MCC key set, charger battery, thermocouples and some field-level equipment. This project ignited the development of Hani Energy excitation control system (Extech).
Project: Design and installation of control and protection system for gas turbine
Unit name: Alstom
Used Technology: DCS SIEMENS PCS7
Estimated time: 5 Month
Unit capacity: 25 Mega Watt
Delivery Date: 2017 May
85 MW Mitsubishi
Hani Energy Company has retrofitted control and protection system of gas turbines which was previously working with Mitsubishi technology in this project.
Project: Design and installation of control and protection system for gas turbine
Unit name: Mitsubishi
Used Technology: DCS SIEMENS PCS7
Estimated time: 6 Month
Unit capacity: 85 Mega Watt
Delivery Date: 2021
25 MW Hitachi
During field visits to projects carried out by the company, the design and replacement of Hitachi control systems has been entrusted to the company under a contract.
Project: Design and installation of control and protection system for gas turbine
Unit name: Hitachi
Used Technology: DCS SIEMENS PCS7
Estimated time: 6 Month
Unit capacity: 25 Mega Watt
Delivery Date: 2021
127 MW Mitsubishi
Design and replacement of two-unit Mitsubishi turbine control system have been assigned to this company under a contract.
Project: Design and installation of control and protection system for gas turbine
Unit name: Mitsubishi
Used Technology: DCS SIEMENS PCS7
Estimated time: 6 Month
Unit capacity: 127 Mega Watt
Delivery Date: 2022
Generator Excitation System
25 MW Alstom
The project has carried out as a comprehensive excitation system with all the operators’ requirements.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: Alstom
Used Technology: DCS SIEMENS PCS7
Estimated time: 8 Month
Unit capacity: 25 Mega Watt
Delivery Date: 2017 June
100 MW GE
The company has fully designed and completely replaced a 1,000-ampere dynamic excitation system to a static system.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: GE
Used Technology: DCS SIEMENS PCS7
Estimated time: 6 Month
Unit capacity: 100 Mega Watt
Delivery Date: 2017 December
20 MW GE
This project includes all the issues of excitation and protection of the generator.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: GE
Used Technology: DCS SIEMENS PCS7
Estimated time: 4 Month
Unit capacity: 20 Mega Watt
Delivery Date: 2018 April
25 MW Hitachi
This project includes all the issues of stimulation and protection of the generator.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: Hitachi
Used Technology: DCS SIEMENS PCS7
Estimated time: 6 Month
Unit capacity: 25 Mega Watt
Delivery Date: 2018 May
25 MW Alstom
This project is the purchase and installation of a generator protection system and AVR turbine control system GE-F5
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: Alstom
Used Technology: DCS SIEMENS PCS7
Estimated time: 3Month
Unit capacity: 25 Mega Watt
Delivery Date: 2020 Jun
60 MW Skoda
The purchase of the Skoda excitation system was assigned to this company under a contract.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: Skoda
Used Technology: DCS SIEMENS PCS7
Estimated time: 2 Month
Unit capacity: 60 Mega Watt
Delivery Date: 2020 April
320 MW LMZ
Changing the excitation system from dynamic to static mode.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: LMZ
Used Technology: DCS SIEMENS PCS7
Estimated time: 3 Month
Unit capacity: 320 Mega Watt
Delivery Date: 2020 April
320 MW ANSALDO
This project includes Designing and Implementation of a Static Excitation System without Transformer for 320 MW Units.
Project: Designing and Replacing Comprehensive Generator Excitation and Protection System
Unit name: ANSALDO
Used Technology: DCS SIEMENS PCS7
Estimated time: 14 Month
Unit capacity: 320 Mega Watt
Delivery Date: 2021 May