UPGRADE 32 MW Asec Unit control System
This system has been designed and implemented for 32 megawatts of Acec unit and replaced the old pneumatic control system.
Project: Design and installation of control and protection system for gas turbine
Unit name: Asec
Used Technology: DCS SIEMENS PCS7
Estimated time: 18 Month
Unit capacity: 32 Mega Watt
Delivery Date: 2015 November