UPGRADE 4 MW Typhoon Unit control System
Designing and replacing the control systems of 8 turbo-pumps of the pump stations of an oil’s pipelining company was deposited to our company.
Project: Design and installation of control and protection system for gas turbine
Unit name: Typhoon
Used Technology: DCS SIEMENS PCS7
Estimated time: 12 Month
Unit capacity: 4 Mega Watt
Delivery Date: 2017 May