Skip to content

Turbine Control  

In the first Gtech steam project, the old turbine control from the LMZ Company of Russia, was successfully replaced by Gtech control system. The new system is based on the latest DCS Siemens PCS7, and with 400H grade LCDs, and it is designed to control a 320 MW steam turbine.

The most important features of the new DCS system are:

Implementation of a Startup Mode and Automated Shut Down modes.

  1. Implementation of an Intelligent Troubleshooter.
  2. Implementation of automated thermal tension management system.
  3. Increasing the system response time .
  4. Adding protection against maximum speed with logic 2 of 3
  5. Implementation of the data connection with the boiler control system
  6. Possibility to set up the unit in both models of the following turbine, boiler

TypeMark I - Mark II

ServicesControl Turbines Excitation system

Some Projects

25 Mega Watt Alstom

In this project, only the turbine and generator in the mechanical sector has purchased by the power plant owner and all other equipment supplied and installed by Hani Energy Company. The parts that were designed and manufactured by the company include turbine control and protection system, AVR system and generator protection, MCC key set, charger battery, thermocouples and some field-level equipment. This project ignited the development of Hani Energy excitation control system (Extech).

Project: Design and installation of control and protection system for gas turbine 

Unit name: Alstom

Used Technology: DCS SIEMENS PCS7

Estimated time: 5 Month

Unit capacity: 25 Mega Watt

Delivery Date: 2017 May

85 Mega Watt Mitsubishi

Hani Energy Company has retrofitted control and protection system of gas turbines which was previously working with Mitsubishi technology in this project.

Project: Design and installation of control and protection system for gas turbine 

Unit name: Mitsubishi

Used Technology: DCS SIEMENS PCS7

Estimated time: 6 Month

Unit capacity: 85 Mega Watt

Delivery Date: 2021

25 Mega Watt Hitachi

During field visits to projects carried out by the company, the design and replacement of Hitachi control systems has been entrusted to the company under a contract.

Project: Design and installation of control and protection system for gas turbine 

Unit name: Hitachi

Used Technology: DCS SIEMENS PCS7

Estimated time: 6 Month

Unit capacity: 25 Mega Watt

Delivery Date: 2021

127 Mega Watt Mitsubishi

Design and replacement of two-unit Mitsubishi turbine control system have been assigned to this company under a contract.

Project: Design and installation of control and protection system for gas turbine 

Unit name: Mitsubishi

Used Technology: DCS SIEMENS PCS7

Estimated time: 6 Month

Unit capacity: 127 Mega Watt

Delivery Date: 2022